Trident Juncture 18 Support

26 October 2018


In support of Trident Juncture 18, the NSPA fulfilled a Bulgarian multimodal transport requirement.  Two shipments, composed of a dozen of light wheeled vehicles and some cargo was shipped from Bulgaria to Norway. The transit through five different countries over a distance of 2500 Km was organized mainly by road with a short sea movement.

In addition to the Bulgarian requirement, the NSPA organized the movement of cargo from Brunssum, NLD and Bydgoszcz, POL to various final destinations in Norway.

After the exercise finishes, NSPA will re-deploy the equipment to the home bases.